Skip to content
Reut GiladiEngineering & Renovation, home
עברית
Book a flat surveyBook a survey

+972 3-000-4141

Living through a renovation

When there's no water, when there's dust, when there's noise. Written down in advance, for every month.

01

A whole flat, month by month

MonthWhat happensWaterDustNoiseSleep there
1Strip-out. The old comes out, and the terrazzo is covered.Off from the second weekA lotA lot, 08:00–13:00No
2Pipes and wiring inside the walls.A temporary tap in the kitchenSomeChasing walls, Sunday to TuesdayNo
3Plaster, waterproofing and tiling.Back at the end of the monthSomeA littleNo
4Joinery, the kitchen, and polishing the terrazzo.OnA week of fine dust while polishing; the flat is closedA littleFor part of the month
5Handover. And after a month, we come back to check.OnNoneNoneYes

02

Three more things

  • A bathroom alone

    Three to four weeks. You can stay at home: no shower for three weeks, and a temporary toilet from day two.

  • The neighbours

    A letter to the neighbours and the residents' committee a week ahead. The stairwell and the lift covered. Rubble goes down every day, never piled in the yard.

  • The plan on the door

    Every Sunday a new plan goes up inside the front door: what happens this week, who is coming, and when the water is off.

Hands smoothing filler on a white wall

Book a survey

+972 3-000-4141

Book a flat survey
A two-hour survey, a written report within a week. Or just call.

survey@giladi.example
4 HaBanaim St, Tel Aviv (a fictional address)

Office: Sunday to Thursday, 08:00–17:00
On site: Sunday to Thursday 07:30–16:30, Friday 07:30–12:00 with no noise