- Terrazzo
- Shutters
- Doors
Renovating flats in buildings from the 1930s to the 1960s, from Bauhaus to the first housing blocks.
4 HaBanaim St, Tel Aviv
(a fictional address)
Registered civil engineer, no. 00000 (fictional)
Reut Giladi · Reut Giladi Renovation
01
Kept / Replaced
We keep the terrazzo, the shutters and the doors. We replace the pipes and the wiring behind them, all of them.

Kept
- The terrazzo floor
- The wooden shutters
- The old interior doors
- The frames and windows, where they can be mended
- The balcony railing
Replaced
- All the water and drain pipes
- All the wiring, from the panel to the socket
- The gas line
- The waterproofing in the wet rooms
- Plaster that has taken in damp
One crew works on one flat at a time. A whole flat takes three to five months, and Reut signs her name to each one.
The buildings
- Bauhaus, the 1930s
- The 1940s
- Housing blocks, the 1950s
- The 1960s
02
What we do
A flat survey
Two hours in the flat and a written report within a week: what is in the walls, what stays and what goes, and a price range for each part.
Pipes and wiring
We replace all of it, from the wall to the panel. No old pipe patched beside a new one.
Terrazzo floors
Cleaning, missing tiles made good with tiles from the same building, and polishing.
Shutters and doors
Taken down, mended in the workshop and put back. Only what can't be mended is replaced.
A whole flat
Three to five months, one crew, and a plan for every month: when there's no water, when there's dust, when there's noise.
A survey for buyers
Before you sign for an old flat: what is hiding in the walls, and what it will cost to put right. Within three working days.
03
Projects
Four sample flats, each by the year its building went up.
04
Book a survey
Book a flat survey
A two-hour survey, a written report within a week. Or just call.
survey@giladi.example
4 HaBanaim St, Tel Aviv (a fictional address)
Office: Sunday to Thursday, 08:00–17:00
On site: Sunday to Thursday 07:30–16:30, Friday 07:30–12:00 with no noise









